References

Software

Austria
Consulting Servicies and Support for the TNA Software and CGMES format

Consulting Servicies and Support for the TNA Software and CGMES format

Client: Austria Power Grid APG (Austria)

Type: Software

Finishing date: December 2021 (May 2022)

Team: Boris Brdjanin – Project Manager, B. Lutovac

Transmission, Renewable, Power Quality

Georgia
Georgia Energy Storage Strategy for Grid

Georgia Energy Storage Strategy for Grid

Client: EDF CIST (France), European Investment Bank

Type: Study

Finishing date: December 2021

Team: EDF Cist and EKC as subcontractor; EKC: Milan Ivanovic - Task V Leader

Transmission

Rwanda
Improving Operations of Rwanda’s National Control Center

Improving Operations of Rwanda’s National Control Center

Client: USEA, USAID, REG Rwanda Energy Group (Rwanda)

Type: Other

Finishing date: December 2021 (December 2022)

Team: Nebojsa Jovic - Project Manager, Transmission System Operation Expert, M. Ivanovic, B. Lutovac

Generation, Transmission, Renewable

Bosnia and Herzegovina
Analysis of the possibility of Connecting WPP Morine to the Transmission System of Bosnia and Herzegovina, including the Determination of the maximum Power Capacity of WPP Morina

Analysis of the possibility of Connecting WPP Morine to the Transmission System of Bosnia and Herzegovina, including the Determination of the maximum Power Capacity of WPP Morina

Client: EFT Group HE Ulog (B&H)

Type: Study

Finishind date: November 2021

Team: Slobodan Markovic – Project Manager, B. Sijakovic, L. Mladjenovic, Z. Velickovic, M. Vukovic

Transmission

Bosnia and Herzegovina
Grid Connection Study of HPP Dabar (159MW)

Grid Connection Study of HPP Dabar (159MW)

Client: ZD IRCE a.d., MH Elektroprivrede Republike Srpske (Bosnia and Herzegovina)

Type: Study

Finishing date: November 2021

Team: Nikola Georgijevic – Project Manager, M. Ivanovic, M. Vukovic

Software

Austria
Non-costly Remedial Action Optimization and Presolve algorithm for the Flow-Based Capacity Calculation with TNA

Non-costly Remedial Action Optimization and Presolve algorithm for the Flow-Based Capacity Calculation with TNA

Client: APG-Austrian Power Grid (Austria)

Type: Software

Finishing date: November 2021

Team: Danka Todorovic - Project Manager, D. Vlaisavljevic, N. Georgijevic, B. Lutovac, I. Aljancic

Transmission, Renewable

Serbia
Assessment of Available System Capacities for Connection of Solar Power Plants in the Region of Leskovac, Bujanovac and Odzaci

Assessment of Available System Capacities for Connection of Solar Power Plants in the Region of Leskovac, Bujanovac and Odzaci

Client: UGT Renewables LLC (USA)

Type: Analysis

Finishing date: November 2021

Team: Nebojsa Jovic - Project Manager, S. Mijailovic, L. Mladjenovic

Transmission, Renewable

Bosnia and Herzegovina

Grid Connection Study of SPP Trebinje to the Transmission System of B&H

Client: ZD IRCE a.d., MH Elektroprivreda Republike Srpske (Bosnia and Herzegovina)

Type: Report

Finishing date: July 2021

Team: Milan Stojanovic - Project Manager, M. Ivanovic, M. Vukovic, D. Todorovic, B. Brdjanin

Transmission

North Macedonia
Strengthening the Transmission Network in the Southeast of North Macedonia

Strengthening the Transmission Network in the Southeast of North Macedonia

Client: DB Engineering & Consulting GmbH (Germany), European Investment Bank - EIB

Type: Study

Finishing date: October 2021 (March 2022)

Team: Hill International IPF7 Consortium, EKC team: S. Markovic - Transmission Engineer, P. Miksa, N. Jovic, Z. Nesovanovic, O. Vukovic, D. Orlic

Generation, Transmission

Serbia
Selection of Optimal Electromechanical Parameters of Revitalized Generation Units (10×32MW) in HPP Djerdap 2

Selection of Optimal Electromechanical Parameters of Revitalized Generation Units (10×32MW) in HPP Djerdap 2

Client: Elektromreza Srbije a.d. (Serbia)

Type: Report

Finishing date: September 2021

Team: Djordje Dobrijevic - Project Manager, N. Jovic, M. Kostic

Pages