References
Software
Consulting Servicies and Support for the TNA Software and CGMES format
Client: Austria Power Grid APG (Austria)
Type: Software
Finishing date: December 2021 (May 2022)
Team: Boris Brdjanin – Project Manager, B. Lutovac
Transmission, Renewable, Power Quality
Georgia Energy Storage Strategy for Grid
Client: EDF CIST (France), European Investment Bank
Type: Study
Finishing date: December 2021
Team: EDF Cist and EKC as subcontractor; EKC: Milan Ivanovic - Task V Leader
Transmission
Improving Operations of Rwanda’s National Control Center
Client: USEA, USAID, REG Rwanda Energy Group (Rwanda)
Type: Other
Finishing date: December 2021 (December 2022)
Team: Nebojsa Jovic - Project Manager, Transmission System Operation Expert, M. Ivanovic, B. Lutovac
Generation, Transmission, Renewable
Analysis of the possibility of Connecting WPP Morine to the Transmission System of Bosnia and Herzegovina, including the Determination of the maximum Power Capacity of WPP Morina
Client: EFT Group HE Ulog (B&H)
Type: Study
Finishind date: November 2021
Team: Slobodan Markovic – Project Manager, B. Sijakovic, L. Mladjenovic, Z. Velickovic, M. Vukovic
Transmission
Grid Connection Study of HPP Dabar (159MW)
Client: ZD IRCE a.d., MH Elektroprivrede Republike Srpske (Bosnia and Herzegovina)
Type: Study
Finishing date: November 2021
Team: Nikola Georgijevic – Project Manager, M. Ivanovic, M. Vukovic
Software
Non-costly Remedial Action Optimization and Presolve algorithm for the Flow-Based Capacity Calculation with TNA
Client: APG-Austrian Power Grid (Austria)
Type: Software
Finishing date: November 2021
Team: Danka Todorovic - Project Manager, D. Vlaisavljevic, N. Georgijevic, B. Lutovac, I. Aljancic
Transmission, Renewable
Assessment of Available System Capacities for Connection of Solar Power Plants in the Region of Leskovac, Bujanovac and Odzaci
Client: UGT Renewables LLC (USA)
Type: Analysis
Finishing date: November 2021
Team: Nebojsa Jovic - Project Manager, S. Mijailovic, L. Mladjenovic
Transmission, Renewable
Grid Connection Study of SPP Trebinje to the Transmission System of B&H
Client: ZD IRCE a.d., MH Elektroprivreda Republike Srpske (Bosnia and Herzegovina)
Type: Report
Finishing date: July 2021
Team: Milan Stojanovic - Project Manager, M. Ivanovic, M. Vukovic, D. Todorovic, B. Brdjanin
Transmission
Strengthening the Transmission Network in the Southeast of North Macedonia
Client: DB Engineering & Consulting GmbH (Germany), European Investment Bank - EIB
Type: Study
Finishing date: October 2021 (March 2022)
Team: Hill International IPF7 Consortium, EKC team: S. Markovic - Transmission Engineer, P. Miksa, N. Jovic, Z. Nesovanovic, O. Vukovic, D. Orlic
Generation, Transmission
Selection of Optimal Electromechanical Parameters of Revitalized Generation Units (10×32MW) in HPP Djerdap 2
Client: Elektromreza Srbije a.d. (Serbia)
Type: Report
Finishing date: September 2021
Team: Djordje Dobrijevic - Project Manager, N. Jovic, M. Kostic