References

Generation, Transmission

Serbia
Selection of Optimal Electromechanical Parameters of Generation unit No. 1 (470MVA) in TPP Kolubara B

Selection of Optimal Electromechanical Parameters of Generation unit No. 1 (470MVA) in TPP Kolubara B

Client: Elektromreža Srbije (Serbia)

Type: Study (Transmission, Generation)

Finishing date: March 2020

Team: Djordje Dobrijevic - Project Manager, S. Markovic, M. Kostic

Transmission

Montenegro
Analysis of the Construction of Existing Budva Substation Introducing a Busbar Section Disconnector, as well as the Increase of the Transmission Capacity of OHL 110kV Budva-Lastva

Analysis of the Construction of Existing Budva Substation Introducing a Busbar Section Disconnector, as well as the Increase of the Transmission Capacity of OHL 110kV Budva-Lastva

Client: CGES AD (Montenegro)

Type: Analysis (Transmission)

Finishing date: March 2020

Team: Slobodan Markovic – Team Leader, M. Ivanovic, M. Kostic

Transmission

Bahrein, GCCIA
EWA Bahrein - Grid Impact Studies

EWA Bahrein - Grid Impact Studies

Client: EDF CIST (France), EWA (Bahrein)

Type: Study (Transmission)

Finishing date: November 2019 (March 2020)

Team: EDF Cist (France) - EKC; EKC team: Predrag Miksa - Project Manager, D. Todorovic

Transmission, Software

South East Europe
Consulting services: Upgrade of Software Solution for Automated Day Ahead Congestion Forecast Procedure

Consulting services: Upgrade of Software Solution for Automated Day Ahead Congestion Forecast Procedure

client: KFW Bank (Germany), OST (Albania)

type: Software

finishing date: February 2020 (January '22)

team: Danka Todorovic – Project Manager, Z. Vujasinovic – Consultant, B. Brdjanin, B. Lutovac, M. Kostic

Transmission, Software

Austria
TNA 2.3. APG: Transmission Network Analyzer – CGMES Extension

TNA 2.3. APG: Transmission Network Analyzer – CGMES Extension

Client: Austrian Power Grid APG (Austria)

Finishing date: February 2020

Type: Software (Software, Transmission)

Team: Consortium EKC - Schneider Electric DMS; EKC Team: Zoran Vujasinovic – Project Manager, B. Lutovac, D. Todorovic, B. Brdjanin

Transmission, Market

Georgia, Armenia, Azerbaijan, Romania, South East Europe
Economic Analysis of Georgia – Romania Interconnection (Phase I and Phase II)

Economic Analysis of Georgia – Romania Interconnection (Phase I and Phase II)

client: The World Bank

type: Study (Market, Transmission)

finishing date: Phase I - December 2019, Phase II - June 2020

team: Dragana Orlic - Project Manager, D. Vlaisavljevic, B. Lekovic, O. Vukovic, I. Mihajlovic-Vlaisavljevic

Generation, Transmission, Market

Ukraine, Moldova, Belarus, Central East Europe, South East Europe
Economic and Technical Analysis of Ukraine Back-to-Back Interconnection with Europe

Economic and Technical Analysis of Ukraine Back-to-Back Interconnection with Europe

client: The World Bank

type: Study (Transmission, Generation, Market)

finishing date: December 2019

team: Dusan Vlaisavljevic – Project Manager, M. Ivanovic, Z. Vujasinovic, P. Miksa, I. Mihajlovic-Vlaisavljevic, B. Lekovic, O. Vukovic

Generation, Transmission, Market, Renewable

Montenegro, South East Europe
Variable Renewable Energy Integration Analysis for Montengro

Variable Renewable Energy Integration Analysis for Montengro

client: The World Bank

type: Project (Transmission, Generation, Market, Renewable)

finishing date: November 2019 (March 2020)

team: Dusan Vlaisavljevic – Project leader, N. Jovic - Consultant, S. Markovic, I. Mihajlovic-Vlaisavljevic, D.Todorovic

Generation, Transmission

United Arab Emirates
Sharjah Waste to Energy Project – GRID IMPACT STUDY

Sharjah Waste to Energy Project – GRID IMPACT STUDY

client: EDF Cist (France), CNIM Group (United Kingdom)

type: Report (Transmission, Generation)

finishing date: November 2019 (April 2020)

team: EDF Cist (FRance) - EKC (Serbia), EKC team: Predrag Miksa – Project Leader, D. Todorovic

Transmission

Western Balkan 6 Region
Regional Feasibility Study for Voltage Profiles Improvement in Western Balkan 6 Region

Regional Feasibility Study for Voltage Profiles Improvement in Western Balkan 6 Region

Client: GOPA INTEC/HILL International (Germany)

Finishing date: November 2019 (January 2021)

Type: Study (Transmission)

Team: Nebojsa Jovic - Project Manager, Slobodan Markovic - Project Manager, M. Vukovic - Consultant, Dj. Dobrijevic, M. Ivanovic, M. Stojanovic, O. Vukovic, B. Brdjanin, B. Lutovac