References

Transmission, Policies

Montenegro
Evaluation of Position and Obligations of CGES in Cases of Outages HVDC MONITA

Evaluation of Position and Obligations of CGES in Cases of Outages HVDC MONITA

client: CGES a.d. (Montenegro)

type: Report

finishing date: April 2019

team: Zoran Vujasinovic – Project Manager, N. Jovic – Consultant, B. Lutovac, B. Brdjanin

Generation, Transmission, Renewable, Policies

Albanija

Analysis of the Impact of the WPP Dajc on the Local Transmission Network, Including the Effects and Possibilities for the Construction of the 110kV Network and the New 110kV Interconnection Kosmac (ALB) - Dajc (ALB) - Možura (MNE)

client: A.S.A. Wind Sh.p.k - Rruga А. Z. Cajupi (Albania)

type: Study

finishing date: April 2019 (July 2019)

team: Slobodan Markovic –Study Leader, Z. Vujasinovic, D. Todorovic, M. Vukovic – consulting engineer

Transmission

Columbia, Panama
Development of a LCC HVDC Model in Siemens PSS/E Format

Development of a LCC HVDC Model in Siemens PSS/E Format

client: CESI (Italy)

type: Report

finishing date: March 2019

team: Milan Ivanovic – Project Manager

Transmission

Montenegro
Short-Circuit Calculation in Transmission Grid of Montenegro in period 2020-2029 and necessary Measures for their Decreasing

Short-Circuit Calculation in Transmission Grid of Montenegro in period 2020-2029 and necessary Measures for their Decreasing

client: CGES a.d. (Montenegro)

type: Study (Transmission)

finishing date: March 2019 (June 2019)

team: Djordje Dobrijevic - Project Manager, S. Markovic and M. Vukovic – Consultants, B. Sijakovic

Generation, Transmission, Renewable

Montenegro
Connection Study of Wind Power Plant “Gvozd” (54.6MW) to the Transmission Network of Montenegro

Connection Study of Wind Power Plant “Gvozd” (54.6MW) to the Transmission Network of Montenegro

client: CGES AD (Montenegro)

finishing date: March 2019 (October 2019)

team: Milan Stojanovic – Project Manager, M. Ivanovic

Generation, Transmission

Serbia
Connection Study of CHP 30MW to the Transmission Network of Serbia - CHP Vinca

Connection Study of CHP 30MW to the Transmission Network of Serbia - CHP Vinca

client: Elektromreza Srbije AD (Serbia)

type: Study (Transmission, Generation)

finishing date: March 2019

team: Milan Ivanovic - Project Manager, D. Todorovic

Generation, Transmission, Market

Serbia
Consultancy service for Probabilistic System Adequacy Assessment

Consultancy service for Probabilistic System Adequacy Assessment

client: Elektromreza Srbije AD (Serbia)

type: Analysis

finishing date: March 2019

team: Dragana Orlic - Project Manager, D. Vlaisavljevic, B. Lekovic, I. Mihajlovic-Vlaisavljevic

Generation, Transmission, Renewable

Serbia
Connection Study of Wind Power Plant 102MW to the Transmission Network of Serbia – WPP Plandiste

Connection Study of Wind Power Plant 102MW to the Transmission Network of Serbia – WPP Plandiste

client: Elektromreza Srbije AD (Serbia)

type: Study (Transmission, Generation, Renwable)

finishing date: February 2019

team: Milan Stojanovic - Project Manager, D. Todorovic

Transmission, Software

Slovenia
TNA 2.3 software upgrade for ACER: Power Flow Decomposition functions (PFC, FLD)

TNA 2.3 software upgrade for ACER: Power Flow Decomposition functions (PFC, FLD)

client: ACER d.o.o. (Slovenia)

type: Software (Software, Transmission)

finishing date: February 2019 (March 2019)

team: Zoran Vujasinovic – Project manager, D. Vlaisavljevic, I. Mihajlovic-Vlaisavljevic, D. Todorovic, B. Lekovic

Transmission, Software

Serbia
Building of CGMES Node-Breaker Model of Serbian Grid

Building of CGMES Node-Breaker Model of Serbian Grid

client: Elektromreza Srbije AD (Serbia)

type: Analysis (Software, Transmission)

finishing date: March 2019

team: Danka Todorovic – Project Leader, Z. Vujasinovic – Consultant, B. Brdjanin, B. Lutovac, I. Aljancic