References

Generation, Transmission, Market, Policies

Lithuania
Services of Adequacy Assessment of Lithuanian Electric Power System for 2026-2030

Services of Adequacy Assessment of Lithuanian Electric Power System for 2026-2030

Client: RTE International (France), LitGrid AB (Lithuania)

Type: Study

Finishing date: August 2022

Team: Dragana Orlic – Project Manager, D. Vlaisavljevic, I. Mihajlovic Vlaisavljevic, B. Lekovic, M. Kostic

Generation, Transmission, Market, Renewable

Serbia
Feasibility Study, North CSE Corridor, Substation 400/110kV Belgrade West, 400kV OHL Belgrade West – SY Čibuk 1 and 400kV OHL Serbia – Romania

Feasibility Study, North CSE Corridor, Substation 400/110kV Belgrade West, 400kV OHL Belgrade West – SY Čibuk 1 and 400kV OHL Serbia – Romania

Client: Planet SA (Greece), European Investment Bank

Type: Study

Finishing date: August 2022

Team: Bosko Sijakovic – Project Manager, N. Jovic, D. Orlic, B. Lekovic, S. Markovic, Z. Nesovanovic

Generation, Market

Montenegro
Adequacy And Flexibility Of The Montenegrian Power System

Study On System Adequacy And Flexibility Of The Montenegrian Power System

Client: USEA, USAID

Type: Study

Finishing date: August 2022

Team: Branko Lekovic - Project Manager, D. Orlic, D. Vlaisavljevic, I. Mihajlovic Vlaisavljevic, M. Kostic, Slobodan Markovic

Transmission

Montenegro
Study of Electricity Losses in Transmission Network of Montenegro

Study of Electricity Losses in Transmission Network of Montenegro

Client: CGES AD (Montenegro)

Type: Study

Finishing date: August 2022

Team: Milan Ivanovic - Project Manager, B. Sijaković, B. Brdjanin, M. Vukovic

Generation, Transmission, Renewable, Power Quality

Bosnia and Herzegovina
Connection Study of Wind Power Plant Široka Draga (125.4MW) to the Transmission Network of B&H

Connection Study of Wind Power Plant Široka Draga (125.4MW) to the Transmission Network of B&H

Client: IMRES smartgreen-energy d.o.o. Livno (Bosnia and Herzegovina)

Type: Report

Finishing date: June 2022

Team: Milan Ivanovic - Project Leader, L. Mladjenovic

Transmission

Ethiopia
Proposing Size and Location of Dynamically Changing Reactive Compensation Devices (STATCOM)

Proposing Size and Location of Dynamically Changing Reactive Compensation Devices (STATCOM)

Client: CESI S.p.A. (Italy)

Type: Study

Finishing date: June 2022

Team: Milan Stojanovic – Project Manager, L. Mladjenovic

Generation, Transmission, Market

Central Europe (CORE region)

Analysis of Optimal Locations for Controllable Devices to Support Flow-based Market Coupling and Grid Operation in the CORE Region

Client: ELES d.o.o. (Slovenia)

Type: Study

Finishing date: February 2022 (October 2022)

Team: Dusan Vlaisavljevic – Project Leader, M. Ivanovic, I. Mihajlovic Vlaisavljevic, B. Lekovic, B. Lutovac, N. Georgijevic, O. Vukovic, B. Brdjanin

Market, Software

Serbia
Study of the Possibility of Interfacing OPS-ODS in the Context of Electricity Market Development

Study of the Possibility of Interfacing OPS-ODS in the Context of Electricity Market Development

Client: AD Elektromreza Srbije (Serbia)

Type: Study (Distribution, Market, Software)

Finishing date: June 2022

Team: Consortium IMP Automatika - EKC (Serbia); EKC team: Nebojsa Jovic - Project Manager, M. Ivanovic, N. Georgijevic, B. Lutovac, L. Mladjenovic

Transmission, Market, Policies

Serbia
Compliance of EMS AD Grid Codes with ENTSO-E Network Codes

Compliance of EMS AD Grid Codes with ENTSO-E Network Codes

Client: AD Elektromreza Srbije (Serbia)

Type: Study

Finishing date: June 2022

Team: Consortium IMP Automatika - EKC (Serbia); EKC team: Nebojsa Jovic - Project Manager, D. Vlaisavljevic, I. Mihajlovic Vlaisavljevic, D. Veljkovic, B. Lutovac

Software

Austria
Implementation of the GSK Core Format in TNA Software

Implementation of the GSK Core Format in TNA Software

Client: Austrian Power Grid AG (Austria)

Type: Software

Finishing date: May 2022

Team: Bogdan Lutovac – Project Manager, B. Brdjanin, I. Aljancic