References
Generation, Transmission, Market, Policies
Services of Adequacy Assessment of Lithuanian Electric Power System for 2026-2030
Client: RTE International (France), LitGrid AB (Lithuania)
Type: Study
Finishing date: August 2022
Team: Dragana Orlic – Project Manager, D. Vlaisavljevic, I. Mihajlovic Vlaisavljevic, B. Lekovic, M. Kostic
Generation, Transmission, Market, Renewable
Feasibility Study, North CSE Corridor, Substation 400/110kV Belgrade West, 400kV OHL Belgrade West – SY Čibuk 1 and 400kV OHL Serbia – Romania
Client: Planet SA (Greece), European Investment Bank
Type: Study
Finishing date: August 2022
Team: Bosko Sijakovic – Project Manager, N. Jovic, D. Orlic, B. Lekovic, S. Markovic, Z. Nesovanovic
Generation, Market
Study On System Adequacy And Flexibility Of The Montenegrian Power System
Client: USEA, USAID
Type: Study
Finishing date: August 2022
Team: Branko Lekovic - Project Manager, D. Orlic, D. Vlaisavljevic, I. Mihajlovic Vlaisavljevic, M. Kostic, Slobodan Markovic
Transmission
Study of Electricity Losses in Transmission Network of Montenegro
Client: CGES AD (Montenegro)
Type: Study
Finishing date: August 2022
Team: Milan Ivanovic - Project Manager, B. Sijaković, B. Brdjanin, M. Vukovic
Generation, Transmission, Renewable, Power Quality
Connection Study of Wind Power Plant Široka Draga (125.4MW) to the Transmission Network of B&H
Client: IMRES smartgreen-energy d.o.o. Livno (Bosnia and Herzegovina)
Type: Report
Finishing date: June 2022
Team: Milan Ivanovic - Project Leader, L. Mladjenovic
Transmission
Proposing Size and Location of Dynamically Changing Reactive Compensation Devices (STATCOM)
Client: CESI S.p.A. (Italy)
Type: Study
Finishing date: June 2022
Team: Milan Stojanovic – Project Manager, L. Mladjenovic
Generation, Transmission, Market
Analysis of Optimal Locations for Controllable Devices to Support Flow-based Market Coupling and Grid Operation in the CORE Region
Client: ELES d.o.o. (Slovenia)
Type: Study
Finishing date: February 2022 (October 2022)
Team: Dusan Vlaisavljevic – Project Leader, M. Ivanovic, I. Mihajlovic Vlaisavljevic, B. Lekovic, B. Lutovac, N. Georgijevic, O. Vukovic, B. Brdjanin
Market, Software
Study of the Possibility of Interfacing OPS-ODS in the Context of Electricity Market Development
Client: AD Elektromreza Srbije (Serbia)
Type: Study (Distribution, Market, Software)
Finishing date: June 2022
Team: Consortium IMP Automatika - EKC (Serbia); EKC team: Nebojsa Jovic - Project Manager, M. Ivanovic, N. Georgijevic, B. Lutovac, L. Mladjenovic
Transmission, Market, Policies
Compliance of EMS AD Grid Codes with ENTSO-E Network Codes
Client: AD Elektromreza Srbije (Serbia)
Type: Study
Finishing date: June 2022
Team: Consortium IMP Automatika - EKC (Serbia); EKC team: Nebojsa Jovic - Project Manager, D. Vlaisavljevic, I. Mihajlovic Vlaisavljevic, D. Veljkovic, B. Lutovac
Software
Implementation of the GSK Core Format in TNA Software
Client: Austrian Power Grid AG (Austria)
Type: Software
Finishing date: May 2022
Team: Bogdan Lutovac – Project Manager, B. Brdjanin, I. Aljancic