References

Generation, Market, Renewable

Armenia
Armenia Variable Renewable Energy Grid Integration Analysis:  • Hourly Dispatch Simulation (Phase I) • Balancing and Reserve Analysis (Phase II)

Armenia Variable Renewable Energy Grid Integration Analysis: • Hourly Dispatch Simulation (Phase I) • Balancing and Reserve Analysis (Phase II)

Client: The World Bank

Finishing date: May 2020 (Phase I), June 2020 (Phase II)

Type: Study (Market, Generation, Renewables)

Team: Dragana Orlic - Project Manager, D. Vlaisavljevic, B. Lekovic, O. Vukovic, I. Mihajlovic-Vlaisavljevic

Generation, Transmission, Market, Software, Renewable

H2020: "Future Flow" - Designing eTrading Solutions for Electricity Balancing and Redispatching in Europe

H2020: "Future Flow" - Designing eTrading Solutions for Electricity Balancing and Redispatching in Europe

client: European Commission (EC)

type: Project (Transmission, Generation, Market, Software, Renewable)

finishing date: December 2019

team: Future Flow Consortium (ELES - Slovenia, APG - Austria, MAVIR - Hungaria, TRANSELECTRICA - Romania, ELEKTRO ENERGIJA - Slovenia, GEN-I - Slovenia, SAP - Germany, CYBERGRID - Austria, GEMALTO - France, EIMV - Slovenia, 3E - Belgium, EKC - Serbia);

EKC team: Zoran Vujasinovic - Project Leader, D. Vlaisavljevic, N. Jovic, I. Mihajlovic-Vliasavljevic

Generation, Market

Belarus
Power Market Modeling and Assessment of Impacts of Electricity Market Opening on the cost of Electricity in Belarus

Power Market Modeling and Assessment of Impacts of Electricity Market Opening on the cost of Electricity in Belarus

client: The World Bank

type: Analysis (Market, Generation)

finishing date: June 2019 (March 2020)

team: Dragana Orlic - Project Manager, D. Vlaisavljevic, B. Lekovic, O. Vukovic, S. Mijailovic - Consultant

Transmission

Rwanda
Review of Frequency and Voltage Control Concepts in the Power System of Rwanda

Review of Frequency and Voltage Control Concepts in the Power System of Rwanda

client: USEA, REG (Rwanda)

type: Analysis (Transmission)

finishing date: February 2020

team: Nebojsa Jovic - Project Manager, M. Ivanovic, B. Lutovac

Transmission, Power Quality

Montenegro
Consulting Services for Implementation of New SCADA/EMS

Consulting Services for Implementation of New SCADA/EMS

client: CGES AD (Montenegro)

type: Consulting services (Power System Monitoring and Control, Transmission)

finishing date: December 2017 (December 2019)

team: consortium EKC -EFusion (Montenegro); EKC team: M. Vuković - Project Leader, N. Jovic, Z. Vujasinovic, Z. Nesovanovic

Generation, Transmission, Market

Black Sea Region
Black Sea Regional Transmission System Planning Project (BSTP): •  PSS/E Automation Workshop •  BSTP Models Update •  System Adequacy Study Phase II

Black Sea Regional Transmission System Planning Project (BSTP): • PSS/E Automation Workshop • BSTP Models Update • System Adequacy Study Phase II

client: USEA, USAID

type: Study (Transmission, Generation, Market)

finishing date: December 2019

team: Dragana Orlic - Project Manager, M. Ivanovic, B. Lekovic

Market

Serbia, South East Europe
Support for EMS (Serbian TSO) in Terms of International Cooperation – Development of Regional Balancing Market Model in PLEXOS Software Tool

Support for EMS (Serbian TSO) in Terms of International Cooperation – Development of Regional Balancing Market Model in PLEXOS Software Tool

client: AD Elektromreza Srbije (Serbia)

type: Project (Market)

finishing date: November 2019

team: Consortium  IMP Automatika d.o.o. (Serbia) - EKC (Serbia) – Ogranak WSP UK Ltd. Beograd (Serbia);

EKC team: Dusan Vlaisavljevic – Project Leader, O. Vukovic

Market, Software

Serbia
Analysis of the effects of market coupling among Serbia, Hungary, Croatia and Bulgaria, with simulations in MaCSIM software

Analysis of the effects of market coupling among Serbia, Hungary, Croatia and Bulgaria, with simulations in MaCSIM software

client: SEEPEX a.d. Beograd (Serbia)

type: Study

finishing date: August 2019

team: Zoran Vujasinovic – Project Manager,  D. Vlaisavljevic, M. Kostic, Z. Velickovic, I. Aljancic

Generation, Transmission, Market, Renewable, Policies

Montenegro
Ten Years Transmission Network Development Plan of CGES 2020 - 2029

Ten Years Transmission Network Development Plan of CGES 2020 - 2029

client: CGES ad (Montenegro)

finishing date: June 2019

team: Slobodan Markovic – Project manager, Dj. Dobrijevic, B. Sijakovic, O. Vukovic, B. Lekovic

Generation, Transmission, Renewable, Power Quality

Serbia
Grid Code Compliance Testing for Wind Power Plant Čibuk 1

Grid Code Compliance Testing for Wind Power Plant Čibuk 1

client: Vetroelektrane Balkana Ltd. (Serbia)

type: Study

finishing date: January 2019 (March 2019)

team: Milan Stojanovic - Project Manager, N. Jovic - Consultant, M. Ivanovic, D. Todorovic

Pages