References
Transmission, Power Quality
Calculation of Short Circuit Currents in SS Podgorica 1 from the Aspect of Dimensioning Grounding System
client: CGES ad (Montenegro)
type: Study (Transmission, Power Quality)
finishing time: May 2016
team: Milan Ivanovic - Project Leader, M. Vukovic - Consultant
Generation, Transmission, Market
GTMax Demonstration Analysis for Myanmar
client: Adica (USA)
type: Study (Market, Generation, Transmission)
finishing date: May 2016
team: Dusan Vlaisavljevic – Project Leader, I. Mihajlovic, S. Mijailovic – Consultant
Transmission, Market, Renewable
Support for Low Emission Development in South Eastern Europe (SLED project): Decarbonisation Modelling in the Electricity Sector
client: REKK Energiapiaci Tanácsadó Kft (Hungary), The Regional Environmental Center for Central and Eastern Europe (Hungary)
type: Study (Transmission, Market, Renewable)
finishing date: March 2016
team: Slobodan Markovic -Task Leader, B. Sijakovic, I. Mihajlovic
Generation, Transmission, Market
Analysis of Energy Export Scenarios from Georgia to Turkey
client: World Bank
type: Study (Transmission, Generation, Market)
finishing date: April 2016
team: Zoran Vujasinovic - Project manager, S. Mijailovic - Consultant, D. Vlaisavljevic, I. Mihajlovic
Transmission, Power Quality
Analysis of the Power System of Montenegro with SVC in Niksic Alloyed Engineering Steel
client: CGES ad (Montenegro)
type: Study (Transmission, Power Quality)
finishing date: January 2016
team: Milan Ivanovic - Project Leader, S. Markovic - Consultant, M. Stojanovic
Generation, Renewable, Policies
Procedure for Compliance Testing of Power Park Modules
client: CGES (Montenegro)
type: Consultancy services (Policies, Generation)
finishing date: March 2016
team: Nebojsa Jovic – Project Manager, M. Vukovic – Consultant, M. Ivanovic
Generation, Transmission, Market
Ukraine Power System Support Project (UPSS) – An Equivalent of the Ukrainian Transmission Network Simulation Model for the World Bank Generation Optimization Study (Phase V)
client: USEA, USAID
type: Study (Transmission, Generation, Market)
finishing date: December 2015
team: Milos Stojkovic - Project Manager, D. Orlic
Software
Implementation of Wide Area Monitoring System (WAMS) in Power System of Serbia
client: Elektromreza Srbije - EMS (Serbia)
type: System implementation (Software, Power System Monitoring and Control)
finishing date: December 2015 (April 2016)
team: Consortium EKC – ELPROS (Slovenia) – Saturn Electric (Serbia); EKC team: Nebojsa Jovic - Project Leader, M. Vukovic - Consultant
Transmission
Transmission Network Development Plan of Montenegro 2015-2029
client: CGES (Monenegro)
type: Study (Transmission)
finishing date: December 2015
team: CGES - EKC Consortium; EKC team: Slobodan Markovic - Project Leader, B. Sijakovic, Dj. Dobrijevic, M. Vukovic and N. Jovic - Consultants
Transmission, Market
eHighway 2050: Modular Development Plan of the Pan-European Transmission System 2050
client: ENTSO-E (Belgium)
type: Study (Transmission, Market)
finishing date: December 2015
team: Consortium 15 TSOs, 10 Universities / Institutes, 3 Associations; EKC team: Dragana Orlic - Coordinator of EKC’s activities within the Project, D. Vlaisavljevic