Grid Compliance Testing of WPP Krnovo
client: CGES a.d. (Montenegro)
type: Technical Support
finishing date: July 2017
team: Nebojsa Jovic – Project Manager, M. Vukovic – Consultant, M. Stojanovic, M. Ivanovic
The objective of this project is to support CGES, as Transmission System Operator, in the processes of revision of testing protocols, conduction of on-site tests as well as revision of grid compliance testing report. This support comprises the following activities:
- Revision of grid compliance testing protocol for WPP Krnovo
- Support during conduction of on-site tests
- Active power control
- Test of active power control
- Test of frequency response
- Test of active power ramping rates
- Voltage control
- Test of automatic voltage control mode
- Test of automatic reactive power control model
- Test of automatic power factor control mode
- Test of reactive power capabilities
- Low Voltage Ride Through
- Test of fault ride through capability
- Power Quality
- Test of influence of WPP to power quality parameters
- Test of signals, communication and control
- Test of communication signals between WPP and CGES
- Validation of simulation model
- Revision of grid compliance testing report based on which the final operational notification for WPP Krnovo is issued
Type of services provided:
- Revision of testing protocol
- On-site tests
- Active power control
- Voltage control
- Fault-ride Through Capability
- Power Quality
- Signals, communication and control
- Revision of grid compliance testing report