Assessment of Available System Capacities for Connection of Solar Power Plants in the Region of Negotin

Serbia
Assessment of Available System Capacities for Connection of Solar Power Plants in the Region of Negotin

Client: UGT Renewables LLC (USA)

Type: Analysis

Finishing date: June 2021

Team: Nebojsa Jovic - Project Manager, S. Mijailovic, L. Mladjenovic

The project aims to assess available transmission system capacities for connection of solar power plants in the region of Negotin.

The following services have been provided:

  • Model preparation for target year 2025
  • Assessment of SPP connection on 400 kV voltage level
  • Assessment of SPP connection on 110 kV voltage level
  • Sensitivity analyses with a focus on HPP Djerdap 1 and HPP Djerdap 2 influence on future maximum power of SPP.

Type of services provided:

  • Data collection
  • Grid modelling
  • Power flow analysis
  • Voltage profile analysis
  • Contingency analysis
  • Sensitivity analysis