Connection Study of Wind Power Plant Široka Draga (125.4MW) to the Transmission Network of B&H
Client: IMRES smartgreen-energy d.o.o. Livno (Bosnia and Herzegovina)
Type: Report
Finishing date: June 2022
Team: Milan Ivanovic - Project Leader, L. Mladjenovic
Objective of the connection study is to analyze all possible connection variants and to determine optimal point of interconnection between WPP Široka Draga and transmission network, taking into account valid transmission network development plan and minimization of the total investment costs for the connection infrastructure.
After determination of interconnection point, the following tasks have been performed in order to verify whether wind turbines SG 6.0-155, envisaged to be installed in WPP Široka Draga, comply with the BIH grid code:
- Integration of simulation model of the WPP into regional SEE dynamic model in software PSSE and DIgSILENT
- Load flow analyses – network element loadings, security N-1 assessment, power losses, voltage and reactive power control
- Short circuit contribution assessment
- Impact of WPP intermittent generation to power system of BIH (system reserve)
- Mid-term stability - Stability assessment after large disturbances in the power system of BiH
- Short-term and long-term voltage stability assessment
- Small signal stability assessment
- Assessment of power quality indices in connection point - Voltage flickers (normal and switching operation), harmonic distortion
- EMT simulations - Switching transient overvoltage assessment
Type of services provided:
- Optimal PCC analyses
- Load flow analyses
- Network security assessment
- Voltage stability and reactive power control analyses
- Short circuit analyses
- System reserve analyses
- Transient stability analyses
- Mid-term stability analyses
- Small signal stability analyses
- Power quality analyses
- EMT analyses