Technical Assistance for the Connection Network Codes implementation in the Energy Community
Client: Energy Community Secretariat (Austria)
Type: Project (Transmission, Distribution, Policies)
Finishing date: April 2021
Team: Nebojsa Jovic - Project Manager, Dj. Dobrijevic, M. Stojanovic, B. Lutovac
The overall objective of the project is to assist the beneficiaries in further implementation of all technical requirements set in:
- Network Code on requirements for grid connection of generators
- Network Code on Demand Connection
The specific objective of the project is to assist Distribution and Transmission System Operators in the Contracting Parties in implementation of all technical requirements set in the connection network codes through:
- Setting the specific parameters required to be defined on a country level (TSO/DSO) by the connection codes,
- Drafting the provisions for respective DSO and TSO documents related to connection process (such as Distribution and Transmission Grid Codes) and containing technical connection requirements and parameters,
- Methodologies with rationale for selection of particular technical requirements/parameters to serve as the ground for justification in future public consultations,
- Identification of connection issues and related business processes which affect both TSO and DSO and require their close collaboration.
Type of services provided:
- Data collection
- Development of methodologies for determination of non-exhaustive parameters set in Network Codes
- Setting of non-exhaustive parameters
- Drafting the provisions for national legal/technical legislation
- Specification of business processes for TSO and DSO