Consultancy Services to Review and Enhance TRANSCO Network Integrity with GCCIA through Defense Management
Client: Ogranak WSP UK Ltd. Beograd (Serbia), TRANSCO (UAE)
Type: Study
Finishing date: August 2021 (January 2022)
Team: Ogranak WSP UK Ltd. Beograd (Serbia) and EKC as subcontractor, EKC team: Predrag Miksa - Task leader, N. Jovic – Consultant, M. Stojanovic
GCCIA interconnection experienced large disturbances in the past that lead to unsatisfied behavior of the system. Idea of this project is to check adequacy of present protection scheme and if necessary to propose Special Protection Scheme to enable undisturbed system operation even for large disturbances like loss of 1390MW generation in NPP Baraha, taking into consideration future grid and generation developments (especially PV solar power plants).
Besides, it was necessary to evaluate small signal stability of the region taking into consideration new generation capacities in Northern Emirates.
Type of services provided:
- Upgrade of models for Load flow
- Upgrade of models for Dynamics
- Upgrade of models with protections
- Dynamic stability analyses
- Small Signal Stability analyses
- Implementing remedial actions
- Evaluation of protection system operation